LO1 Risk Assessment
Risk assessment for our Documentary:
Probability Key:
1 | Unlikely |
2 | Likely |
3 | Very likely |
Impact Key:
1 | Low |
2 | Medium |
3 | High |
Probability and impact levels on a scale from 1 to 3:
Hazard description | Project phase | Impact description | Probability | Impact | Risk level | Control measures |
Risk of tripping on wires from the equipment | Production | Could cause injury which means filming will be halted | 1 | 1 | Low | Watch surroundings or make sure equipment is out of the way |
Risk of getting lost at the location | Production | May not be able to film if we can’t find the location | 1 | 2 | Low | Make sure we are on time for transport and have apps like google maps |
Risk of equipment being damaged by people/weather | Production | Will halt filming | 2 | 3 | Medium | Make sure we choose the correct day and that someone is watching the equipment |
Risk of leaving equipment at location or on transport | Production | Can stop filming meaning we would need to find the lost equipment | 2 | 2 | Medium | Make a list of all equipment taken and then check it frequently |
Risk of getting injured by vehicles | production | Could cause injury and damage which would result in film being halted | 1 | 3 | Medium | Watch our surroundings for vehicles or anything that could cause us harm |